Werribee Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Frame inspection in Werribee

The frame stage is the last time the whole structure is on show, and on Werribee builds it is the stage that produces the most major findings.

  • When walls, trusses and roof cover are up, before any sarking or insulation hides them
  • 1 to 2 hours on site
  • Report within 24 hours
Request a Werribee quoteChoose the inspection, leave your details and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookWhen walls, trusses and roof cover are up, before any sarking or insulation hides them
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Werribee frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Werribee builds

Werribee frames have shown joist hangers fitted but never nailed, engineered bolts missing from connections, bracing panels narrower than their detail and lintels without the tie-down their span requires. Each of those is a load path that plaster will hide.

What we find at this stage in Werribee

  • Joist hangers not nailed off
  • Engineered bolts missing at connections
  • Bracing panels below their minimum width
  • Angle braces running the same direction
  • Lintels without the required tie-down
  • Bottom plates cut in loadbearing walls
Two angle braces on one wall running the same way instead of opposing, found during a frame inspection in Werribee
Two angle braces on one wall running the same way instead of opposing
Bracing sheet nails driven too deep, weakening how the panel holds the frame, found during a frame inspection in Werribee
Bracing sheet nails driven too deep, weakening how the panel holds the frame
Sample findings

Sample defects found during our frame inspections in Werribee

Annotated findings from Frame inspections.

Joist hanger fitted but never nailed off, so the floor joist is not properly carried, found during a frame inspection in Werribee
Joist hanger fitted but never nailed off, so the floor joist is not properly carried
Bolts shown in the engineering missing from a structural connection, found during a frame inspection in Werribee
Bolts shown in the engineering missing from a structural connection
Bracing panel narrower than the 900mm its engineering detail is written for, found during a frame inspection in Werribee
Bracing panel narrower than the 900mm its engineering detail is written for
Lintel between 1.8 and 3.6 metres long without the tie-down its span requires, found during a frame inspection in Werribee
Lintel between 1.8 and 3.6 metres long without the tie-down its span requires

The other stages of a Werribee build

  1. Bored piers inspection in Werribee1Bored piersAfter the holes are drilled and the cages set, before concrete goes in
  2. Slab pre-pour inspection in Werribee2Slab pre-pourOnce pods, steel and membrane are down, the day before concrete
  3. Lock-up (pre-plaster) inspection in Werribee4Lock-up (pre-plaster)With roof, windows, external doors and cladding on, before plasterboard
  4. Fixing inspection in Werribee5FixingWhen doors, skirtings and cabinetry are in, ahead of the painter
  5. Waterproofing inspection in Werribee6WaterproofingAfter the membrane has cured and before the tiler arrives
  6. Pre-handover (PCI) inspection in Werribee7Pre-handover (PCI)Roughly a week before the builder hands over the keys

All construction stage inspections in Werribee →

Guides

Construction stage guides for Werribee

All guides →

Book a frame inspection in Werribee

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Werribee: common questions

Why is frame the stage to book if I can only book one?

Because it is the last point where the load path is visible from slab to roof. Once linings go up, a missing bolt or unnailed hanger can only be found by cutting into the wall.

What is a joist hanger and why must it be nailed?

It is a steel bracket that carries the end of a floor joist. Without its nails the joist is resting in the bracket, not held by it.

Do you check roof trusses?

We check how they are supported, fixed and braced and whether any member has been cut or damaged. Design sign-off for the trusses rests with the Werribee job's truss supplier.

What standards do you use at frame?

Your engineering and the truss layout, AS 1684 for timber framing and AS 4055 for the wind classification that sets bracing and tie-down.

What if the builder says the engineer approved it?

Then ask for the amended engineering in writing. Our report notes what was built against what the issued drawings show.

Can the frame be checked again after repairs?

Yes. A recheck before plaster confirms which items have been closed.

CallGet a Free Quote