Which stage turns up the most serious items on Werribee builds?
Frame. It is where engineered connections, tie-downs and bracing are all exposed at once, and on Werribee jobs it has produced more major structural findings than any other stage. Slab pre-pour comes next.
Which items sit outside a Werribee stage inspection?
Our checks are made by eye and by hand. We do not energise or test electrical work, pressure test plumbing, open up finished work, certify engineering or test soil. Licensed trades, your engineer and the building surveyor look after those.
How late can I leave the booking?
One to two working days is usually enough. Ask your supervisor for the next stage date as early as possible, because programs on Werribee estates move at short notice.